TECON Basic Line (YR2019 + FM2018)
Price estimates have no recorded source or date and are not current supplier quotations. Capacity units are unverified. Confirm the process stage, units and configuration before comparing these figures.
Overview
TECON basic production line: YR2019 tuber (150 bags/min) + FM2018 bottomer. Complete matched line for standard cement valve bags at affordable investment.
Technical Specifications
| Model | TC-LINE-BASIC |
|---|---|
| Type | Complete Line |
| Sub-Type | Valve Sack |
| Material | Paper |
| Automation | Full Auto |
| Capacity | 60–100 (unit unverified) |
| Bag Width | 350–620 mm |
| Bag Length | 350–1100 mm |
| Layers | 2–3 layers |
| Bag Weight | 25, 40, 50 kg |
| Power | 45 kW |
| Weight | 7 tons |
| Print Colors | 4-color |
| Seal Types | Valve |
Key Features
Advantages
- Complete matched TECON line
- Affordable entry
- Proven components
- Since 1983
Considerations
- Basic automation
- 3-layer limit
Recorded applications
Compare TECON Basic Line (YR2019 + FM2018)
See how this machine compares against alternatives in side-by-side analysis.
More from TECON
Similar Complete Line Machines
FAQs
What is the price of TECON Basic Line (YR2019 + FM2018)?
The database records $85,000–$160,000 USD for TECON Basic Line (YR2019 + FM2018) as an unverified estimate. Its source and date are not recorded. Request a current supplier quotation specifying the configuration, delivery, installation, taxes and spare parts included.
What is the production capacity of TECON Basic Line (YR2019 + FM2018)?
The TECON Basic Line (YR2019 + FM2018) produces 60–100 as recorded capacity. The unit is unverified; confirm speed and process stage with the manufacturer.
What materials can TECON Basic Line (YR2019 + FM2018) process?
The TECON Basic Line (YR2019 + FM2018) processes Paper materials, specializing in Valve Sack applications. Seal types include: Valve.
Who should buy the TECON Basic Line (YR2019 + FM2018)?
The TECON Basic Line (YR2019 + FM2018) is best suited for: New Factory, Medium Factory, Startup. Consider your production volume, material requirements, and budget when choosing this machine.