Energy & Utilities

Energy & Utilities — recorded cost ranges
Factor Region Value Unit Basis
Electricity india USD 0.05–0.1 per kWh USD
Electricity china USD 0.08–0.15 per kWh USD
Electricity africa USD 0.1–0.2 per kWh USD
Electricity europe USD 0.15–0.3 per kWh USD
Electricity middle_east USD 0.08–0.15 per kWh USD

Labor Costs

Labor Costs — recorded cost ranges
Factor Region Value Unit Basis
Machine Operator india USD 2–5 per hour USD
Machine Operator africa USD 1.5–3.5 per hour USD
Machine Operator china USD 3–6 per hour USD
Machine Operator europe USD 15–25 per hour USD
Machine Operator americas USD 12–20 per hour USD
Machine Operator middle_east USD 4–8 per hour USD

Maintenance & Spare Parts

Maintenance & Spare Parts — recorded cost ranges
Factor Region Value Unit Basis
Annual Maintenance global 3–8 per year (% of machine cost) Percentage of equipment cost
Spare Parts global 2–5 per year (% of machine cost) Percentage of equipment cost

Raw Materials

Raw Materials — recorded cost ranges
Factor Region Value Unit Basis
Kraft Paper (70-90 GSM) global USD 0.55–0.85 per kg USD
PP Woven Fabric global USD 0.8–1.2 per kg USD
PE Film (liner) global USD 1.1–1.6 per kg USD
Adhesive (chemical) global USD 1.5–3 per kg USD
Ink (flexo) global USD 3–8 per kg USD
Thread (sewing) global USD 2–5 per cone USD

Cost Factors by Region

africa

2 cost factors tracked
  • Machine Operator: USD 1.5–3.5 per hour
  • Electricity: USD 0.1–0.2 per kWh
Browse regions

americas

1 cost factors tracked
  • Machine Operator: USD 12–20 per hour
Browse regions

china

2 cost factors tracked
  • Machine Operator: USD 3–6 per hour
  • Electricity: USD 0.08–0.15 per kWh
View region

europe

2 cost factors tracked
  • Machine Operator: USD 15–25 per hour
  • Electricity: USD 0.15–0.3 per kWh
Browse regions

global

8 cost factors tracked
  • Kraft Paper (70-90 GSM): USD 0.55–0.85 per kg
  • PP Woven Fabric: USD 0.8–1.2 per kg
  • PE Film (liner): USD 1.1–1.6 per kg
  • Adhesive (chemical): USD 1.5–3 per kg
  • Ink (flexo): USD 3–8 per kg
  • Thread (sewing): USD 2–5 per cone
  • Annual Maintenance: 3–8 per year (% of machine cost)
  • Spare Parts: 2–5 per year (% of machine cost)
Browse regions

india

2 cost factors tracked
  • Machine Operator: USD 2–5 per hour
  • Electricity: USD 0.05–0.1 per kWh
View region

middle_east

2 cost factors tracked
  • Machine Operator: USD 4–8 per hour
  • Electricity: USD 0.08–0.15 per kWh
Browse regions