Price estimate (USD) $200,000–$500,000
Recorded capacity 300–1200 unit unverified
Power 40 kW
Layers 1–3

Price estimates have no recorded source or date and are not current supplier quotations. Capacity units are unverified. Confirm the process stage, units and configuration before comparing these figures.

Overview

Haver & Boecker Integra FFS system. 300-1200 bags/hour (1-4 spouts), 5-50kg bags with PE tubular film. Impeller dosing, vacuum compaction for brick-shaped bags. Plug & Play enclosed housing.

Technical Specifications

Model Integra FFS
Type Ffs
Material Pe
Automation Full Auto
Capacity 300–1200 (unit unverified)
Bag Width 350–420 mm
Bag Length 350–950 mm
Layers 1–3 layers
Bag Weight 5, 10, 15, 20, 25, 40, 50 kg
Power 40 kW
Weight 8 tons
Print Colors 4-color
Seal Types Heat Seal

Key Features

FFS form-fill-seal
300-1200 bags/hour
1-4 filling spouts
5-50 kg bags
PE tubular film
impeller dosing
vacuum compaction
brick-shaped bags
Plug & Play system

Advantages

  • 300-1200 bags/hour flexible
  • 5-50kg range
  • Brick-shaped output
  • Plug & Play system

Considerations

  • PE film only
  • High investment
  • Complex maintenance

Recorded applications

Cement PlantLarge FactoryDust Sensitive

FAQs

What is the price of Haver & Boecker Integra FFS?

The database records $200,000–$500,000 USD for Haver & Boecker Integra FFS as an unverified estimate. Its source and date are not recorded. Request a current supplier quotation specifying the configuration, delivery, installation, taxes and spare parts included.

What is the production capacity of Haver & Boecker Integra FFS?

The Haver & Boecker Integra FFS produces 300–1200 as recorded capacity. The unit is unverified; confirm speed and process stage with the manufacturer.

What materials can Haver & Boecker Integra FFS process?

The Haver & Boecker Integra FFS processes Pe materials. Seal types include: Heat Seal.

Who should buy the Haver & Boecker Integra FFS?

The Haver & Boecker Integra FFS is best suited for: Cement Plant, Large Factory, Dust Sensitive. Consider your production volume, material requirements, and budget when choosing this machine.