About
Price $1,000,000–$2,500,000
Speed 200–400 bags/hr
Power 250 kW
Layers 2–5

Overview

Premium European valve sack factory. W&H class tuber (350-500/min) + bottomer (280-400/min). Full automation, Industry 4.0, remote monitoring. 200-400 sacks/min total throughput.

Technical Specifications

Model PKG-L-EU
Type Complete Line
Sub-Type Valve Sack
Material Paper
Automation Full Auto
Capacity 200–400 bags/hr
Bag Width 280–700 mm
Bag Length 320–1650 mm
Layers 2–5 layers
Bag Weight 25, 40, 50 kg
Power 250 kW
Weight 40 tons
Print Colors 4-color
Seal Types Valve, Square Bottom

Key Features

W&H or equivalent tuber + bottomer
European build quality
high-speed 200-400/min
full automation
Industry 4.0 integration
remote monitoring

Advantages

  • 200-400 sacks/min throughput
  • European build quality
  • Industry 4.0 ready
  • Remote monitoring

Considerations

  • €1M+ investment
  • Requires skilled workforce
  • Long lead time

Best For

Large Cement PlantPremium MarketHigh Volume

Frequently Asked Questions

What is the price of Premium European Valve Sack Factory Package?

The Premium European Valve Sack Factory Package is priced between $1,000,000 and $2,500,000 USD. Actual pricing may vary by region, configuration, and dealer.

What is the production capacity of Premium European Valve Sack Factory Package?

The Premium European Valve Sack Factory Package produces 200–400 bags per hour, depending on bag size, material, and configuration.

What materials can Premium European Valve Sack Factory Package process?

The Premium European Valve Sack Factory Package processes Paper materials, specializing in Valve Sack applications. Seal types include: Valve, Square Bottom.

Who should buy the Premium European Valve Sack Factory Package?

The Premium European Valve Sack Factory Package is best suited for: Large Cement Plant, Premium Market, High Volume. Consider your production volume, material requirements, and budget when choosing this machine.

Need Help Choosing?

Use our interactive tools to compare machines, calculate costs, or find the perfect machine for your factory.