About
Specification BW SYMACH FILLstar Double Spout Bag Filler BW SYMACH FILLstar Single Spout Bag Filler
Type Packer Packer
Material Multi Multi
Automation Full Auto Full Auto
Speed (bags/hr) 1200–2280 600–1200
Layers
Bag Width (mm) 250–600 250–600
Bag Length (mm) 350–1000 350–1000
Price (USD) $150,000–$350,000 $80,000–$200,000
Power (kW) 20 kW 12 kW
Weight (tons) 5 t 3.5 t
Print Colors N/A N/A

Comparison Summary

In our side-by-side comparison, the BW SYMACH FILLstar Single Spout Bag Filler leads in 2 out of 3 measurable categories. However, the best choice depends on your specific production requirements, budget, and regional availability.

BW SYMACH FILLstar Double Spout Bag Filler

BW SYMACH FILLstar double spout bag filler. Up to 38 bags/min. Double spout for 2x throughput. 4-50 kg range.

Advantages

  • 38 bags/min double spout
  • 2x throughput
  • AC servo
  • Universal spout

Considerations

  • Higher investment
View Full Specs

BW SYMACH FILLstar Single Spout Bag Filler

BW SYMACH FILLstar single spout bag filler. Up to 20 bags/min. AC servo, modular closure, recipe-based changeovers. 4-50 kg range.

Advantages

  • 20 bags/min single spout
  • AC servo precision
  • Modular closure
  • Recipe changeover

Considerations

  • Open-mouth only
View Full Specs
Which is faster, BW SYMACH FILLstar Double Spout Bag Filler or BW SYMACH FILLstar Single Spout Bag Filler?

The BW SYMACH FILLstar Double Spout Bag Filler has a higher maximum speed of 2280 bags/hr compared to 1200 bags/hr.

Which is more affordable, BW SYMACH FILLstar Double Spout Bag Filler or BW SYMACH FILLstar Single Spout Bag Filler?

The BW SYMACH FILLstar Single Spout Bag Filler starts at a lower price point ($80,000). However, total cost of ownership includes maintenance, power, and spare parts.

Can I use BW SYMACH FILLstar Double Spout Bag Filler and BW SYMACH FILLstar Single Spout Bag Filler for cement bag production?

Both machines can be evaluated for cement bag applications. Check the material compatibility, bag dimensions, and automation level against your specific production requirements.