About
Specification Lohia LSL 8 Standard Circular Loom Starlinger FX 6.0 High-Speed Circular Loom
Type Circular Loom Circular Loom
Material Pp Woven Pp Woven
Automation Full Auto Full Auto
Speed (bags/hr)
Layers 1–1 1–1
Bag Width (mm) 350–1000 300–850
Bag Length (mm)
Price (USD) $25,000–$50,000 $50,000–$100,000
Power (kW) 15 kW 18 kW
Weight (tons) 2.5 t 3 t
Print Colors N/A N/A

Comparison Summary

In our side-by-side comparison, the Lohia LSL 8 Standard Circular Loom leads in 3 out of 3 measurable categories. However, the best choice depends on your specific production requirements, budget, and regional availability.

Lohia LSL 8 Standard Circular Loom

Lohia LSL 8 standard 8-shuttle circular loom. Working width 350-1000mm for PP/HDPE fabric. Reliable workhorse for cement bag fabric.

Advantages

  • 8-shuttle standard
  • 1000mm width
  • Cement rated
  • Competitive pricing

Considerations

  • Standard vs Nova series
View Full Specs

Starlinger FX 6.0 High-Speed Circular Loom

Starlinger FX 6.0 high-speed circular loom. 6-shuttle for PP/HDPE/PET tapes. Width 300-850mm. Oil-free fabric suitable for food packaging.

Advantages

  • High-speed 6-shuttle
  • Oil-free food-grade fabric
  • PET tape capable
  • Austrian precision

Considerations

  • Premium loom pricing
View Full Specs
Which is faster, Lohia LSL 8 Standard Circular Loom or Starlinger FX 6.0 High-Speed Circular Loom?

Speed data is available on the individual machine pages. Visit the links above for full specifications.

Which is more affordable, Lohia LSL 8 Standard Circular Loom or Starlinger FX 6.0 High-Speed Circular Loom?

The Lohia LSL 8 Standard Circular Loom starts at a lower price point ($25,000). However, total cost of ownership includes maintenance, power, and spare parts.

Can I use Lohia LSL 8 Standard Circular Loom and Starlinger FX 6.0 High-Speed Circular Loom for cement bag production?

Both machines can be evaluated for cement bag applications. Check the material compatibility, bag dimensions, and automation level against your specific production requirements.