About
Specification Lachenmeier Multi FleX1 Stretch Hooder San Chyi SC-RPM Roll-to-Roll Printing Machine
Type Auxiliary Auxiliary
Material Multi Pp Woven
Automation Full Auto Full Auto
Speed (bags/hr)
Layers
Bag Width (mm) 300–800
Bag Length (mm)
Price (USD) $200,000–$500,000 $40,000–$90,000
Power (kW) 20 kW 15 kW
Weight (tons) 8 t 3 t
Print Colors N/A 4-color

Comparison Summary

In our side-by-side comparison, the San Chyi SC-RPM Roll-to-Roll Printing Machine leads in 3 out of 3 measurable categories. However, the best choice depends on your specific production requirements, budget, and regional availability.

Lachenmeier Multi FleX1 Stretch Hooder

Lachenmeier Multi FleX1 stretch hooder. 250+ pallets/hr. 5-sided waterproof + UV protection. Up to 4 film rolls. Building/chemical rated.

Advantages

  • 250+ pallets/hr
  • 5-sided waterproof
  • UV protection
  • 4 film rolls

Considerations

  • High investment
  • Auxiliary only
View Full Specs

San Chyi SC-RPM Roll-to-Roll Printing Machine

San Chyi SC-RPM roll-to-roll printing machine. 4-12 colors at 60-70 m/min. Double-side printing. 800mm max width. Hot air drying.

Advantages

  • 4-12 colors
  • 60-70 m/min
  • Double-side printing
  • Hot air drying

Considerations

  • PP woven only
View Full Specs
Which is faster, Lachenmeier Multi FleX1 Stretch Hooder or San Chyi SC-RPM Roll-to-Roll Printing Machine?

Speed data is available on the individual machine pages. Visit the links above for full specifications.

Which is more affordable, Lachenmeier Multi FleX1 Stretch Hooder or San Chyi SC-RPM Roll-to-Roll Printing Machine?

The San Chyi SC-RPM Roll-to-Roll Printing Machine starts at a lower price point ($40,000). However, total cost of ownership includes maintenance, power, and spare parts.

Can I use Lachenmeier Multi FleX1 Stretch Hooder and San Chyi SC-RPM Roll-to-Roll Printing Machine for cement bag production?

Both machines can be evaluated for cement bag applications. Check the material compatibility, bag dimensions, and automation level against your specific production requirements.