About
Specification Joyda Basic 3-Layer Tuber Machine NBE High-Speed 4-Layer Tuber
Type Tuber Tuber
Material Paper Paper
Automation Full Auto Full Auto
Speed (bags/hr) 80–120 120–170
Layers 2–3 2–4
Bag Width (mm) 300–620 370–620
Bag Length (mm) 410–1100 500–1100
Price (USD) $50,000–$90,000 $60,000–$120,000
Power (kW) 25 kW 35 kW
Weight (tons) 4 t 5 t
Print Colors 4-color 2-color

Comparison Summary

In our side-by-side comparison, the Joyda Basic 3-Layer Tuber Machine leads in 3 out of 5 measurable categories. However, the best choice depends on your specific production requirements, budget, and regional availability.

Joyda Basic 3-Layer Tuber Machine

Joyda basic 3-layer tuber machine. 80-120 tubes/min, PLC control with servo motor. Competitive pricing for medium-scale cement bag production.

Advantages

  • Competitive pricing
  • Servo driven
  • Good for medium scale

Considerations

  • 3-layer max
  • Newer brand
View Full Specs

NBE High-Speed 4-Layer Tuber

NBE Nantong high-speed tuber. 170 tubes/min max (780-820mm cutting), 120-140 normal. 2-4 paper + 1 PE layer. Reel max 1300mm. 35KW. Dimensions 28.72x2.38x2.875m.

Advantages

  • 170 tubes/min max speed
  • 4-layer + PE capability
  • 1300mm reel diameter
  • Competitive Chinese pricing

Considerations

  • Speed depends on cut length
  • Chinese brand
View Full Specs
Which is faster, Joyda Basic 3-Layer Tuber Machine or NBE High-Speed 4-Layer Tuber?

The NBE High-Speed 4-Layer Tuber has a higher maximum speed of 170 bags/hr compared to 120 bags/hr.

Which is more affordable, Joyda Basic 3-Layer Tuber Machine or NBE High-Speed 4-Layer Tuber?

The Joyda Basic 3-Layer Tuber Machine starts at a lower price point ($50,000). However, total cost of ownership includes maintenance, power, and spare parts.

Can I use Joyda Basic 3-Layer Tuber Machine and NBE High-Speed 4-Layer Tuber for cement bag production?

Both machines can be evaluated for cement bag applications. Check the material compatibility, bag dimensions, and automation level against your specific production requirements.