About
Specification Hao Yu Extrusion Coating Lamination Plant Haver RADIMAT-Pathfinder Bag Conveyor System
Type Auxiliary Auxiliary
Material Pp Woven Multi
Automation Full Auto Full Auto
Speed (bags/hr) 3000–6000
Layers
Bag Width (mm) 400–2200
Bag Length (mm)
Price (USD) $80,000–$200,000 $50,000–$120,000
Power (kW) 60 kW 5 kW
Weight (tons) 8 t 2 t
Print Colors N/A N/A

Comparison Summary

In our side-by-side comparison, the Haver RADIMAT-Pathfinder Bag Conveyor System leads in 2 out of 2 measurable categories. However, the best choice depends on your specific production requirements, budget, and regional availability.

Hao Yu Extrusion Coating Lamination Plant

Hao Yu Extrusion Coating Lamination Plant. PP woven fabric coating with HDPE/LDPE/PP. Up to 2200mm width.

Advantages

  • 2200mm wide
  • Multi-polymer coating
  • Lamination capability
  • Taiwanese quality

Considerations

  • Large footprint
View Full Specs

Haver RADIMAT-Pathfinder Bag Conveyor System

Haver RADIMAT-Pathfinder conveyor system. Automatic bag transfer from RADIMAT to Roto-Packer. Enhanced flexibility for cement packing.

Advantages

  • RADIMAT-Roto-Packer bridge
  • Enhanced flexibility
  • Cement optimized
  • Haver integration

Considerations

  • Requires RADIMAT + Roto-Packer
View Full Specs
Which is faster, Hao Yu Extrusion Coating Lamination Plant or Haver RADIMAT-Pathfinder Bag Conveyor System?

Speed data is available on the individual machine pages. Visit the links above for full specifications.

Which is more affordable, Hao Yu Extrusion Coating Lamination Plant or Haver RADIMAT-Pathfinder Bag Conveyor System?

The Haver RADIMAT-Pathfinder Bag Conveyor System starts at a lower price point ($50,000). However, total cost of ownership includes maintenance, power, and spare parts.

Can I use Hao Yu Extrusion Coating Lamination Plant and Haver RADIMAT-Pathfinder Bag Conveyor System for cement bag production?

Both machines can be evaluated for cement bag applications. Check the material compatibility, bag dimensions, and automation level against your specific production requirements.