Four-Shuttle Circular Loom for PP Fabric VS Six-Shuttle Circular Loom for PP Fabric
Detailed side-by-side comparison of specifications, pricing, features, and suitability.
| Specification | Four-Shuttle Circular Loom for PP Fabric | Six-Shuttle Circular Loom for PP Fabric |
|---|---|---|
| Type | Circular Loom | Circular Loom |
| Material | Pp Woven | Pp Woven |
| Automation | Full Auto | Full Auto |
| Speed (bags/hr) | — | — |
| Layers | 1–1 | 1–1 |
| Bag Width (mm) | 350–800 | 350–1000 |
| Bag Length (mm) | — | — |
| Price (USD) | $15,000–$35,000 | $25,000–$55,000 |
| Power (kW) | 15 kW | 22 kW |
| Weight (tons) | 2.5 t | 3.5 t |
| Print Colors | N/A | N/A |
Comparison Summary
In our side-by-side comparison, the Four-Shuttle Circular Loom for PP Fabric leads in 2 out of 3 measurable categories. However, the best choice depends on your specific production requirements, budget, and regional availability.
Four-Shuttle Circular Loom for PP Fabric
Four-shuttle circular loom for PP tubular fabric.
Advantages
- High density weaving
- Auto stop on breakage
Considerations
- Fabric only
Six-Shuttle Circular Loom for PP Fabric
Premium six-shuttle circular loom with electronic let-off.
Advantages
- 6-shuttle speed
- Wider fabric
- Electronic let-off
Considerations
- Higher cost
Frequently Asked Questions
Which is faster, Four-Shuttle Circular Loom for PP Fabric or Six-Shuttle Circular Loom for PP Fabric?
Speed data is available on the individual machine pages. Visit the links above for full specifications.
Which is more affordable, Four-Shuttle Circular Loom for PP Fabric or Six-Shuttle Circular Loom for PP Fabric?
The Four-Shuttle Circular Loom for PP Fabric starts at a lower price point ($15,000). However, total cost of ownership includes maintenance, power, and spare parts.
Can I use Four-Shuttle Circular Loom for PP Fabric and Six-Shuttle Circular Loom for PP Fabric for cement bag production?
Both machines can be evaluated for cement bag applications. Check the material compatibility, bag dimensions, and automation level against your specific production requirements.