About
Specification Bühler MWPF-A Single-Spout Packer (Free-Flowing) Premier Tech CHRONOS VPS Auger Valve Packer
Type Packer Packer
Material Multi Multi
Automation Full Auto Full Auto
Speed (bags/hr) 420–1200 120–300
Layers
Bag Width (mm) 250–550 250–550
Bag Length (mm) 350–900 350–900
Price (USD) $60,000–$150,000 $70,000–$160,000
Power (kW) 10 kW 8 kW
Weight (tons) 3 t 2.5 t
Print Colors N/A N/A

Comparison Summary

In our side-by-side comparison, the Bühler MWPF-A Single-Spout Packer (Free-Flowing) leads in 2 out of 3 measurable categories. However, the best choice depends on your specific production requirements, budget, and regional availability.

Bühler MWPF-A Single-Spout Packer (Free-Flowing)

Bühler MWPF-A single-spout packer for free-flowing materials. 7-20 bags/min. Hopper scale. Paper/plastic/textile bags. 10-50 kg.

Advantages

  • 7-20 bags/min
  • Free-flowing specialist
  • Hopper scale
  • Swiss quality

Considerations

  • Single spout only
View Full Specs

Premier Tech CHRONOS VPS Auger Valve Packer

Premier Tech CHRONOS VPS auger valve packer. Up to 300 bags/hr for sticky powders.

Advantages

  • Sticky powder specialist
  • Auger filling
  • 28g accuracy
  • Compact

Considerations

  • Lower throughput
View Full Specs
Which is faster, Bühler MWPF-A Single-Spout Packer (Free-Flowing) or Premier Tech CHRONOS VPS Auger Valve Packer?

The Bühler MWPF-A Single-Spout Packer (Free-Flowing) has a higher maximum speed of 1200 bags/hr compared to 300 bags/hr.

Which is more affordable, Bühler MWPF-A Single-Spout Packer (Free-Flowing) or Premier Tech CHRONOS VPS Auger Valve Packer?

The Bühler MWPF-A Single-Spout Packer (Free-Flowing) starts at a lower price point ($60,000). However, total cost of ownership includes maintenance, power, and spare parts.

Can I use Bühler MWPF-A Single-Spout Packer (Free-Flowing) and Premier Tech CHRONOS VPS Auger Valve Packer for cement bag production?

Both machines can be evaluated for cement bag applications. Check the material compatibility, bag dimensions, and automation level against your specific production requirements.