About
Specification BEUMER fillpac FFS Haver Roto-Packer RS ADAMS 10-Spout FFS
Type Ffs Ffs
Material Pe Pe
Automation Full Auto Full Auto
Speed (bags/hr) 1800–2600 400–1200
Layers 1–3 1–1
Bag Width (mm) 300–500 210–400
Bag Length (mm) 350–900 300–1000
Price (USD) $350,000–$700,000 $400,000–$800,000
Power (kW) 70 kW 50 kW
Weight (tons) 10 t 12 t
Print Colors 4-color N/A

Comparison Summary

In our side-by-side comparison, the BEUMER fillpac FFS leads in 5 out of 7 measurable categories. However, the best choice depends on your specific production requirements, budget, and regional availability.

BEUMER fillpac FFS

BEUMER fillpac FFS bagging machine. Up to 2600 bags/hour, compact space-saving design. Low-vibration technology, integrated weighing, ergonomic HMI. Symmetrical structure operable from any side.

Advantages

  • 2600 bags/hour max speed
  • Compact footprint
  • Low vibration technology
  • Any-side operation

Considerations

  • Premium German pricing
  • PE film only
  • Complex system
View Full Specs

Haver Roto-Packer RS ADAMS 10-Spout FFS

Haver Roto-Packer RS ADAMS 10-spout rotary FFS. ADAMS dust-free technology with 10 rotating high-performance spouts. 400-1200 bags/hr.

Advantages

  • 10 rotating FFS spouts
  • ADAMS technology
  • Dust-free packaging
  • Brick-shaped output

Considerations

  • Very high investment
  • PE only
View Full Specs
Which is faster, BEUMER fillpac FFS or Haver Roto-Packer RS ADAMS 10-Spout FFS?

The BEUMER fillpac FFS has a higher maximum speed of 2600 bags/hr compared to 1200 bags/hr.

Which is more affordable, BEUMER fillpac FFS or Haver Roto-Packer RS ADAMS 10-Spout FFS?

The BEUMER fillpac FFS starts at a lower price point ($350,000). However, total cost of ownership includes maintenance, power, and spare parts.

Can I use BEUMER fillpac FFS and Haver Roto-Packer RS ADAMS 10-Spout FFS for cement bag production?

Both machines can be evaluated for cement bag applications. Check the material compatibility, bag dimensions, and automation level against your specific production requirements.