About
Specification Arora Automatic Cement Bag Machine Lohia LM 650 Back Seam Sack Machine
Type Complete Line Complete Line
Material Pp Woven Pp Woven
Automation Full Auto Full Auto
Speed (bags/hr) 20–35 60–80
Layers 1–1 1–1
Bag Width (mm) 390–700 525–1560
Bag Length (mm) 300–1200 300–1100
Price (USD) $25,000–$45,000 $80,000–$150,000
Power (kW) 15 kW 30 kW
Weight (tons) 2.5 t 6 t
Print Colors N/A N/A

Comparison Summary

In our side-by-side comparison, the Arora Automatic Cement Bag Machine leads in 3 out of 5 measurable categories. However, the best choice depends on your specific production requirements, budget, and regional availability.

Arora Automatic Cement Bag Machine

Arora Brothers (est. 1998, Shimla) fully automatic cement bag machine. Complete PP woven open-mouth bag production.

Advantages

  • Fully automatic
  • Cement bag specialist
  • Indian pricing

Considerations

  • Open-mouth only
  • Regional brand
View Full Specs

Lohia LM 650 Back Seam Sack Machine

Lohia LM 650 high-speed back seam sack machine. 80 bags/min, fabric width 525-1560mm, cutting 300-1100mm. Integrated tubing and bag making. BOPP film lamination support.

Advantages

  • 80 bags/min speed
  • Very wide fabric up to 1560mm
  • Integrated operation
  • BOPP lamination

Considerations

  • Back seam only
  • Larger machine footprint
View Full Specs
Which is faster, Arora Automatic Cement Bag Machine or Lohia LM 650 Back Seam Sack Machine?

The Lohia LM 650 Back Seam Sack Machine has a higher maximum speed of 80 bags/hr compared to 35 bags/hr.

Which is more affordable, Arora Automatic Cement Bag Machine or Lohia LM 650 Back Seam Sack Machine?

The Arora Automatic Cement Bag Machine starts at a lower price point ($25,000). However, total cost of ownership includes maintenance, power, and spare parts.

Can I use Arora Automatic Cement Bag Machine and Lohia LM 650 Back Seam Sack Machine for cement bag production?

Both machines can be evaluated for cement bag applications. Check the material compatibility, bag dimensions, and automation level against your specific production requirements.